San Siro: over fifteen years of structural engineering, from design to monitoring
Understanding, assessing and supporting one of Milan’s most complex structures over time
The Giuseppe Meazza Stadium in San Siro is a structure of particular significance not only from an architectural and sporting perspective, but also from the standpoint of structural engineering.
The complexity of the stadium is the result of its long construction history. The original facility was built in the early 1900s and was subsequently expanded and transformed in several phases, up to the configuration established through the works carried out for the 1990 FIFA World Cup. The current structure is characterised by four large corner towers supporting the steel roof and by secondary towers supporting the third tier.
From a structural standpoint, the stadium consists of three independent sections, corresponding to the first, second and third tiers. The progressive construction of the structure over a period of approximately 100 years, together with its division into independent sections, are distinctive features of the complex and make it possible to carry out analyses by considering clearly defined portions of the building structure.
Building on this structure, a comprehensive and continuous programme of engineering activities has been developed since 2010, covering structural strengthening, seismic improvement, dynamic behaviour, testing and monitoring.
2012 – Strengthening of the first tier
The first of the main activities considered dates back to 2012 and concerned seismic strengthening of the first tier through jacketing of the existing structural elements.
The intervention required careful consideration of the geometry and construction characteristics of the existing structure, verifying the compatibility between the strengthening measures and the original elements.
Jacketing is a solution aimed at increasing the load-bearing capacity of structural elements by creating a new cross-section that acts compositely with the existing one.
The activity therefore required the design of the strengthening measures, with particular attention to construction details and the way in which the existing structure and the new intervention would act together.
2014 – Seismic improvement of the second tier
In 2014, the activity moved to the second tier, as part of an intervention aimed at improving the seismic performance of the structure.
A key element of the project was the installation of STU – Shock Transmission Units, designed to transfer and control forces between structurally independent parts.
The intervention required consideration not only of individual elements, but also of the interaction between the different parts of the structural system under horizontal loading, within a configuration resulting from successive transformations and extensions.
2019 – Vibrations of the third tier
In 2019, the activity extended into the field of structural dynamics, through specialist consultancy on vibrations affecting the third tier.
Structures designed to accommodate large numbers of people may be subject to dynamic phenomena associated with the presence and simultaneous movement of spectators. Vibration analysis therefore requires the dynamic behaviour of the structure to be characterised, distinguishing the normal responses of the structural system from any phenomena requiring further investigation.
This activity complemented traditional static assessments with an analysis of the stadium’s dynamic response.
2020 – Ten-year structural testing
In 2020, the activity reached a further level of in-depth assessment with the ten-year structural testing, carried out together with MM S.p.A.
Testing a structure such as the Meazza requires a comprehensive reconstruction of the history of the structure, the works carried out and the current condition of its structural elements.
This approach is also reflected in the structural certification activities subsequently carried out for the 2010–2020 period, which examined documentation relating to the works performed during the preceding decade, the requirements of the materials and structures, and a programme of tests and investigations aimed at assessing the adequacy of the structure with respect to current regulations.
The continuity of the knowledge acquired over the years makes it possible to link the design and assessment of interventions with subsequent testing activities.
From testing to monitoring
In 2022, the process evolved towards the long-term management of the structure, with the assignment received from the Municipality of Milan for the monitoring of the stadium.
Monitoring makes it possible to build knowledge of the structure by observing its behaviour over time, complementing assessments carried out at specific points in time.
This approach has an important precedent in the documentation produced by Politecnico di Milano during the previous decade, aimed at establishing a permanent and continuous monitoring system for the stadium structures.
In 2026, the monitoring assignment continued with M-I Stadio, confirming the continuity of the activity and allowing the knowledge base built up over previous years to be further developed.
Through the systematic collection and interpretation of data, monitoring supports the technical management of the structure as well as subsequent maintenance, inspection and design activities.
Smaller-scale interventions
Alongside the main structural and general activities, numerous specialist interventions of a more limited scope have been carried out over the years.
These include various works relating to the second-tier Sky Boxes, Executive Rooms 3 and 6, the Roof Walk on the roof structure, as well as numerous localised repair works.
These activities also require a precise understanding of the existing condition and of how the interventions interact with the existing structures, combining architectural and functional requirements with the preservation of the integrity and safety of the structural system.
Over fifteen years of knowledge built up over time
The value of the experience gained at the Meazza Stadium lies in the continuity and diversity of the activities carried out.
From 2010 to 2026, the work has encompassed several areas of structural engineering: strengthening of existing elements, seismic improvement, installation of STU devices, dynamic and vibration analyses, testing, investigation campaigns on materials and structures, and long-term monitoring.
These are therefore not isolated interventions, but rather a progressive process of understanding, analysis, design, assessment and monitoring.
In a structure transformed over a period of more than 100 years, knowledge of the structure itself is a fundamental component of engineering activity. The ability to intervene repeatedly on the same complex makes it possible to accumulate information on the behaviour of its various components and to approach each new assignment with a technical knowledge base built up over time.
The experience gained at the Meazza therefore represents a concrete example of engineering applied to the entire lifecycle of a major existing structure: from the need to intervene and adapt, to the need to understand, assess and ultimately monitor.
It is precisely this continuity — rather than any single intervention — that characterises the engineering journey developed at the stadium: supporting a complex structure over time, transforming assessment and monitoring activities into an increasingly in-depth understanding of its behaviour.